INTERIOR PROCESS

Step 1: SET-UP & PREPARATION   

  • All specified areas will be drop clothed and covered including walkways, carpet, etc. All large furniture and pieces will be moved to center of the room and covered. All baseboards and trimwork will be taped prior to painting.

  • Wall prep. All wall space will be examined for minor nicks, scrapes, nail pops, etc. These areas will be covered with pro grade SWP Spackle Compound and then sanded smooth.

  • Caulking will be applied to any necessary gaps in between wall space and baseboards as well as countertops and trim boards. “We believe that thorough preparation is key to a quality paint job.”

 
Step 2: PAINTING

  • We will then apply two coats of high quality SWP Paints to all areas specified.


Step 3: DAILY MAINTENANCE

  • Projects running longer than 1 day: We will determine a specified area with the homeowner to temporarily store all paint, materials, tools and drop cloth the area for the night. This is to provide the least amount of inconvenience while your project is in mid process.


Step 4: FINAL WALK THROUGH

  • Finally, a family member representative (Mike, Owen or Joe) will walk around the house making sure all contracted areas are painted properly

 

EXTERIOR PROCESS

STEP 1: POWER WASHING

  • Your house will be thoroughly cleaned using a high pressured power washer to cut loose any failing paint, dirt, mildew, etc.

STEP 2: PAINTING

  • We will then apply two coats of high quality SWP Paints to all areas specified.

STEP 3: DAILY MAINTENANCE

  • Projects running longer than 1 day: We will determine a specified area with the homeowner to temporarily store all paint, materials, tools and drop cloth the area for the night. This is to provide the least amount of inconvenience while your project is in mid process.

STEP 4: FINAL WALK-THROUGH

  • Finally, a family member representative will walk around the house making sure all contracted areas are painted properly.